Hanau–Nantenbach line upgrade
Construction of the "Rheda 2000" slab track system
Client
DB Projektbau GmbH, RB Mitte Frankfurt/ /M.
Project volume
EUR 9.5 million
Construction time
04/2016 - 2017
Services
Construction of the "Rheda 2000" slab track system in a 5,830-m-long double-track section with four single-track tunnels, bridges and several troughs.
Construction of the passable "Eiffage" track covering system in the Falkenberg tunnel.
Construction work carried out:
- construction of approx. 11,647 m of the "Rheda 2000" slab track system in single-track tunnels, in single-track troughs, on earthworks and bridges
- Construction of transition areas in the slab tracks
- Construction of the passable "Eiffage” track covering system in the single-track Falkenberg tunnel (two times approx. 2,640 m)