Rail track renewal trains and equipment

Matisa P100 track renewal train

General data:

  • Total weight: approx. 485 t
  • Length over the buffers: 165 m
  • Bogie spacing: 17.0/14.6 m
  • Engine rating: 2 x 380 kw
  • Max. speed drawn: 100 km/h
  • Operator crew, operation/measurement work: 16
  • Clearance gauge/working position: UIC 505/G1 + G2
  • Line category in transport position: D 2
  • Number of axles/of which rotary: 22/12
Matisa P100 track renewal train

Performance data renewal:

  • Rigging time: 50 min
  • Dismantling time: 30 min
  • Removal and installation of all types of wood, concrete and steel sleepers: up to 500 m/h

Applications:

  • Wooden sleepers, concrete sleepers and steel sleepers
  • Locatable using GPS
  • Hardware final assembly up to 100% under the rail track renewal train
  • Excavating chain with conveyors and silo for the targeted reduction of ballast removed
  • Dynamic ballast plough and excavating chain
  • Ballast management with on-board Fc-wagon
  • Approved for D, DK, NL, S
Sleeper wagon SPS 466 for track renewal train

General data:

  • Total weight: 24.9 t
  • Length over the buffers: 19,900 mm
  • Bogie spacing: 14,860 mm 
  • Max. speed drawn: 100 km/h
  • Max. load of concrete sleepers: 180 x (with a sleeper spacing of 0.60 m, 108 m of track and 0.75 m, 135 m of track)
  • Max load of wooden sleepers: 240 x (with a sleeper spacing of 0.60 m, 144 m of track and 0.75 m, 180 m of track)
30 sleeper wagons SPS 466 for track renewal train

Applications:

  • Wooden sleepers
  • Concrete sleepers

Features:

  • Locatable using GPS
  • Approved for the whole of Europe, RIV